This high-quality and substantial cross-docked, high bay distribution warehouse comprises 540,000sq ft of space on a 30-acre site, just off the M62 which provides a strategic connection to the deep-water ports of Liverpool and the Humber. 

As lead BREEAM Assessor for the project, RedSix ensured a BREEAM Excellent rating was achieved under the BREEAM UK New Construction methodology. RedSix also provided Sustainability champion duties during the design and construction phases, allowing the maximum BREEAM score available to be achieved.